NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1

★★★★★ 5.0 52 reviews

US$12.58
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.ambeeaesthetics.co.uk
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$12.58
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Dec 4
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.ambeeaesthetics.co.uk
Free 30-day returns Details

Product details

Management number 231941487 Release Date 2026/06/18 List Price US$12.58 Model Number 231941487
Category

NASA Work Breakdown Structure (WBS) HandbookNASA SP-2016-3404 (We included Appendix B from 2015 edition which is much more informative)We print NASA handbooks and standards for the convenience of those that use them on a daily basis. We print all of these a full 8 ½ by 11 with large text so they are easy to read. Yes, color books are expensive to print so unless the information relies on the use of color for proper interpretation or understanding, we print most books in black and white to keep the cost down. All these documents are available for download for free from NASA, however printing them all over a network printer would take days.Why buy a book you can download free? We print this so you don't have to.All these books are available for free download from the government web site. Some are available only in electronic media. Some online docs are missing pages or barely legible. We at 4th Watch Publishing are former government employees, so we know how government employees actually use the standards. When a new standard is released, an engineer prints it out, punches holes and puts it in a 3-ring binder. While this is not a big deal for a 5 or 10-page document, many NIST documents are over 100 pages and printing a large document is a time- consuming effort. So, an engineer that’s paid $75 an hour is spending hours simply printing out the tools needed to do the job. That’s time that could be better spent doing engineering. We publish these documents so engineers can focus on what they were hired to do – engineering. It’s much more cost-effective to just order the latest version from Amazon.comIf there is a standard you would like published, let us know. Our web site is usgovpub.comHere are other NASA titles we publish:NASA-STD-5001BStructural Design and Test Factors of Safety for Spaceflight HardwareNASA-STD-5006AGeneral Welding Requirements for Aerospace MaterialsNASA-STD-5008BProtective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support EquipmentNASA-STD-5009ANondestructive Evaluation Requirements for Fracture-Critical Metallic ComponentsNASA-STD-5012BStrength and Life Assessment Requirements for Liquid-Fueled Space Propulsion System EnginesNASA-STD-5019AFracture Control Requirements for Spaceflight HardwareNASA-STD-5005DStandard for The Design and Fabrication of Ground Support EquipmentNASA-HDBK-8739.21Workmanship Manual for Electrostatic Discharge ControlNASA-HDBK 8739.23ANASA Complex Electronics Handbook for Assurance ProfessionalsNASA-HDBK-8719.14 Handbook for Limiting Orbital DebrisNASA-HDBK-8709.22Safety and Mission Assurance Acronyms, Abbreviations, and DefinitionsNASA-HDBK-7009NASA Handbook for Models and Simulations: An Implementation Guide For NASA-STD-7009NASA-HDBK-8739.19-2Measuring and Test Equipment Specifications NASA Measurement Quality Assurance Handbook – Annex 2NASA-HDBK-8739.19-3Measurement Uncertainty Analysis Principles and Methods NASA Measurement Quality Assurance Handbook – Annex 3NASA-HDBK-8739.19-4Estimation and Evaluation of Measurement Decision Risk NASA Measurement Quality Assurance Handbook – Annex 4NASA RCMReliability-Centered Maintenance Guide for Facilities and Collateral Equipment Read more

ASIN B0BVNVM1BC
ISBN13 979-8377301752
Language English
Publisher Independently published
Dimensions 8.25 x 0.37 x 11 inches
Item Weight 9 ounces
Print length 77 pages
Publication date February 13, 2023

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

5 out of 5
★★★★★
52 ratings | 21 reviews
How item rating is calculated
View all reviews
5 stars
90% (47)
4 stars
0% (0)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (5)
Sort by

There are currently no written reviews for this product.